RAMS Software that maps every document to the regulation it evidences
SafeSite AI Technology generates compliant Risk Assessments and Method Statements in minutes — and automatically maps each document to specific UK regulatory clauses, down to regulation number and section.
Regulation Evidence Map

Every RAMS is automatically mapped to the specific UK regulatory clauses it evidences — down to regulation number and section.
Hazard & Risk Matrix

AI-generated hazard identification with 5×5 risk matrix, hierarchy of controls, and residual risk scoring.
Compliance Intelligence
More than a document generator
SafeSite AI Technology connects your RAMS to incidents, approvals, and regulatory evidence — and surfaces compliance risks before they become problems.

The problem with most RAMS software
Most systems tell you a document is complete. They store it. They let you download it. But when an HSE inspector asks which specific regulations your RAMS evidences — and which clauses — most software cannot answer.
SafeSite AI Technology generates the document and maps every section to the specific UK regulation clause it evidences — LOLER Regulation 8, CDM 2015 Regulation 13, PUWER Regulation 5 — automatically.
What SafeSite AI Technology does
UK regulations mapped automatically
SafeSite AI Technology maps RAMS documents to the specific regulations that apply to the work — not a generic checklist.
Why SafeSite AI is different
Most RAMS software stores documents. SafeSite AI Technology connects documents, incidents, approvals, and regulations into a single traceable compliance record. When an incident occurs, the platform links it back to the RAMS, identifies control drift, and surfaces recommended actions — automatically.
This is not a document generator. It is a compliance operating system built for high-risk industries.
Built for high-risk industries
Build audit-ready RAMS with clause-level regulatory evidence
14-day free trial. Full platform access from day one.
Start free trial